Generac Power Systems 20 kW LP ユーザーズマニュアル

ページ / 192
240 VAC
N1
N2
TEST POINTS
Figure 9. Terminal Block Test Points
teSt 37 – check utility SenSinG 
VoltaGe at the circuit Board
DISCUSSION:
If  the  generator  starts  and  transfer  to  STANDBY 
occurs  in  the  automatic  mode  when  acceptable 
UTILITY  source  voltage  is  available  at  the  terminal 
block, the next step is to determine if sensing voltage 
is reaching the printed circuit board.
note: the System ready led will flash in auto or 
utility loSt will display on the panel.
PROCEDURE:
1.  Set the AUTO-OFF-MANUAL switch to OFF.
2.  Disconnect  the  N1/N2  connector  in  the  control  panel 
(see Figure 6).
3.  Set a VOM to measure AC voltage.
4.  Connect  one  meter  test  lead  to Wire  N1.  Connect  the 
other  meter  test  lead  to Wire  N2.  Approximately  240 
VAC should be measured. See Figure 9.
RESULTS:
1.  If voltage was measured in Step 4 and the pin connec-
tions are good, replace the circuit board.
2.  If voltage was NOT measured in Step 4, repair or replace 
Wire N1/N2 between connector and terminal block.
teSt 38 – check utility SenSe VoltaGe
The N1 and N2 terminals in the transfer switch deliver 
utility voltage “sensing” to a circuit board. If voltage at 
the terminals is zero or low, standby generator startup 
and  transfer  to  the  “Standby”  source  will  occur  auto-
matically  as  controlled  by  the  circuit  board.  A  zero 
or  low  voltage  at  these  terminals  will  also  prevent 
retransfer back to the “Utility” source.
PROCEDURE:
With  utility  source  voltage  available  to  terminal  lugs 
N1  and  N2,  use  a VOM  to  test  for  utility  source  line-
to-line  voltage  across  terminal  locations  N1  and  N2 
terminals.  Normal  line-to-line  utility  source  voltage 
should be indicated.
N2
N1
N1A N2A
F1
F2
F3
A
A
A
B
B
B
T1
Figure 10. Transfer Switch Fuse Block
RESULTS:
1.  If  voltage  reading  across  the  N1  and  N2  terminals  is 
zero or low, refer to Flow Chart.
2.  If voltage reading is good, refer to Flow Chart.
teSt 39 – check VoltaGe at terminal 
luGS n1, n2
DISCUSSION:
If  source  voltage  is  not  available  to  N1/N2  terminals, 
automatic startup and transfer to STANDBY will occur 
when  the  generator  AUTO-OFF-MANUAL  switch  is 
set to AUTO. This test will prove that “Utility” voltage is 
available to those terminals, or is not available.
*
 
  DaNGEr: ProcEED WitH cautioN! HiGH 
aND DaNGErous VoltaGEs arE PrEsENt 
at tErmiNal luGs N1/N2. coNtact WitH 
HiGH VoltaGE tErmiNals Will rEsult 
iN DaNGErous aND PossiBlY lEtHal 
ElEctrical sHocK. Do Not attEmPt 
tHis tEst WHilE staNDiNG oN WEt or 
DamP GrouND, WHilE BarEfoot, or 
WHilE HaNDs or fEEt arE WEt.
PROCEDURE:
1.  Make sure that all main line circuit breakers in the utility 
line to the transfer switch are “On” or “Closed.” 
Page 84
Part 3
TRANSFER SWITCH
sEctioN 3.4
DiaGNostic tEsts