Grizzly G0779 ユーザーズマニュアル

ページ / 52
-18-
Model G0779 (Mfd. Since 09/14)
Test Run
Once assembly is complete, test run the machine 
to  ensure  it  is  properly  connected  to  power  and 
safety components are functioning properly.
If you find an unusual problem during the test run, 
immediately stop the machine, disconnect it from 
power, and fix the problem BEFORE operating the 
machine again. The 
Troubleshooting table in the 
SERVICE section of this manual can help.
DO NOT start machine until all preceding 
setup instructions have been performed. 
Operating an improperly set up machine 
may result in malfunction or unexpect-
ed results that can lead to serious injury, 
death, or machine/property damage.
Serious injury or death can result from 
using this machine BEFORE understanding 
its controls and related safety information. 
DO NOT operate, or allow others to operate, 
machine until the information is understood. 
To test run machine:
1.  Clear all setup tools away from machine.
2.  Connect machine to power supply.
3.  Set spindle speed to 90 RPM (see Page 25).
4.  Rotate  spindle  switch  to  RIGHT  to  turn 
machine 
ON.  Verify  motor  operation,  then 
turn  machine 
OFF.  The  motor  should  run 
smoothly  and  without  unusual  problems  or 
noises. Repeat with switch set to LEFT.
Make sure headstock has proper amount of 
oil before performing Test Run and Spindle 
Break-In. Otherwise, headstock compo-
nents may be damaged and void warranty. 
Refer to Page 32 for detailed instructions.
Spindle Break-In
Do not leave drill press unattended dur-
ing Spindle Break-In procedure. If your 
attention is needed elsewhere during this 
procedure,  turn machine OFF  and restart 
procedure later from the beginning.
To perform spindle break-in procedure:
1.  Make  sure  spindle  is  completely  stopped, 
then  set  spindle  speed  to  90  RPM  (refer  to 
Page 25 for detailed instructions).
2.  Run machine for a minimum of 5 minutes in 
each spindle direction.
3.  Repeat Step 2 for each of the spindle speeds.
4.  Change  headstock  oil  (refer  to  Page  31  for 
detailed instructions).
Congratulations! The test run and spindle break-in 
are now complete!
The  spindle  break-in  procedure  distributes  lubri-
cation throughout the bearings to reduce the risk 
of early bearing failure if there are any "dry" spots  
or areas where lubrication has settled in the bear-
ings.  You 
must  complete  this  procedure  before 
placing  operational  loads  on  the  spindle  for  the 
first  time  when  the  machine  is  new  or  if  it  has 
been sitting idle for longer than 6 months.
Always  start  the  spindle  break-in  at  the  lowest 
speed  to  minimize  wear  if  there  are  dry  spots. 
Allow the spindle to run long enough to warm up 
and distribute the bearing grease, then incremen-
tally increase spindle speeds, allowing the spindle 
to run the same amount of time at each speed, until 
reaching  the  maximum  spindle  speed.  Following 
the  break-in  procedure  in  this  progressive  man-
ner helps minimize any potential wear that could 
occur until lubrication is fully distributed.