Fluke A20M-AF ユーザーズマニュアル

ページ / 148
RPM4/HPMS A70M/A20M-AF OPERATION AND MAINTENANCE MANUAL 
© 2007 DH Instruments, a Fluke Company 
Page 8 
2.4 
SETUP 
2.4.1 
PREPARING FOR OPERATION 
To prepare RPM4 for check out and operation: 
  Remove the plastic plug from the RPM4/HPMS rear panel TEST connection. 
  Remove the protective plastic sheet from the front panel display. 
  Familiarize yourself briefly with the RPM4 and HPMS front and rear panels (see Sections 
2.4.2, 2.4.3). 
2.4.2 
RPM4/HPMS FRONT, REAR AND SIDE VIEWS 
2.4.2.1 
RPM4/HPMS FRONT VIEW 
 
1.  RPM4 A70M/A20M-AF Reference Pressure Monitor 
2.  Lo Q-RPT shut-off valve position LED 
3.  Lo Q-RPT shut-off valve 
4.  Lo Q-RPT active valve position LED 
5.  Lo Q-RPT active caution LED 
 
  
Figure 
2. 
 RPM4/HPMS front view