Zhone Technologies 4929 DSLAM ユーザーズマニュアル

ページ / 96
4929-A2-ZN20-30
4929 DSLAM Installation and User’s Guide
17
I
NSTALLATION
Preparation
Consider the following before installing the DSLAM:
z
Installation Site – Your installation site should be well ventilated, clean, 
and free of environmental extremes. 
z
Installation Options – The DSLAM may be: 
— Mounted with the included mounting brackets in a standard 19-inch 
(483 mm) or 23-inch (584 mm) rack (including both Bay Networks 
and Nortel 23-inch racks), or, with separately purchased mounting 
brackets, in a 21-inch (535 mm) ETSI rack. ETSI brackets are 
available. Se
As many 4900 Series DSLAMs may be mounted in a standard rack as 
there are 1.75-inch (44.45 mm) spaces in the rack, so long as 
adequate cooling is provided.
— Mounted on a wall.
— Set on a shelf or desktop. 
Up to eight 4900 Series DSLAMs may be stacked on a shelf or 
desktop. Different models can be mixed in a stack.
z
Power – The DSLAM operates from a –48 VDC power supply to allow 
for standard power connections available in a CO. For AC voltage 
environments, an external AC-to-DC power converter is required.