Motorola CPCI-6020 ユーザーズマニュアル
CPCI-6020 CompactPCI Single Board Computer Installation and Use (6806800A51C)
Hardware Preparation and Installation
Overview of Start-up Procedure
36
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment.
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the board and dispose of it
according to your country’s legislation.
2.3
Overview of Start-up Procedure
The following table lists the things you will need to do before you can use this board and tells
you where to find the information you need to perform each step. Be sure to read this entire
chapter, including all Caution and Warning notes, before you begin.
you where to find the information you need to perform each step. Be sure to read this entire
chapter, including all Caution and Warning notes, before you begin.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
transportation or any items are missing, contact customer service immediately.
Table 2-1 Startup Overview
Task
Page
Unpack the hardware.
Configure the hardware by setting jumpers
on the boards.
on the boards.
Ensure CompactFlash card is installed (if
required).
required).
Ensure memory mezzanines are properly
installed on the board.
installed on the board.
Install PMC Module
(if required).
(if required).
Install the CPCI-6020 in the chassis.
Install PIM on CPCI-6020-MCPTM-01
(if required)
(if required)
Install peripherals, and any other devices or
equipment used.
equipment used.
Power up the system.
Ensure that the debugger initializes the
CPCI-6020
CPCI-6020