Vanguard Managed Solutions 3400 Series ユーザーズマニュアル

ページ / 74
3-4 
Installation and Replacement
Installing The Vanguard 3400 Series
Installation
How to Choose a 
Site
Before you install the Vanguard 3400 Series, select a site for the device.
Choose a site that is within an appropriate distance of a power source. Depending on 
your application, and the country in which the Vanguard 3400 Series is to operate, 
the power source must be a grounded 110 to 220 Vac outlet.
Leave at least 2 inches (5 cm) of clearance in front of the front panel, to allow you to 
see the front panel LEDs, and 6-inches behind the unit for cable clearances (see 
Figure 3-2). For proper ventilation, leave 2 inches (5 cm) of clearance on the sides.
The site should be free of accumulated dust and environmental extremes. Refer to 
Figure 3-2. Proper Cable and Air Clearance
Caution
Vanguard 3400 Series devices should be used in environments designed for 
computers and electronic equipment. In areas susceptible to lightning, take 
precautions to prevent damage to electronic equipment. Contact your telephone 
company or an electronic accessories vendor for information on lightning protection 
equipment. Customers experiencing problems caused by surges from lightning have 
eliminated such problems by installing appropriate surge suppressors on power and 
data lines.
Minimum 2-inches (5 cm) Front
and 6-inches (15 cm) Rear
Note: Do not remove the rubber 
feet from the bottom of the 
unit. They allow for proper 
air flow.
Minimum 2-inches (5 cm)
on either side for ventilation.