Nortel Networks 1002rp ユーザーズマニュアル

ページ / 86
October 2006
Preparing for installation
1002rp Server Hardware Installation
35
6
For a DC-powered server, set up the DC power source (see 
page 50).
7
Place the 1002rp server in the chosen location (see page 60).
8
Replace the front bezel (see page 44).
9
Set the DIP switches on the modem (see page 61).
10
Connect the 1002rp server and devices as follows:
„
Connect the monitor, keyboard, and mouse (see page 65).
„
Connect the modem (see page 61).
„
Connect the 1002rp server to the ELAN hub (Meridian 1 or 
Succession 1000 only) (see page 68).
ATTENTION
To comply with EMC radiation requirements, a Class A hub 
must be located 10 m (33 ft.) away from the 1002rp server. 
Shielded Ethernet cables must be used.
Note: If you are connecting the optional CLAN, do not power 
up unless your antivirus programs and Nortel security updates 
are installed first.
„
Connect the 1002rp server to the CLAN hub (optional) (see 
page 71).
ATTENTION
To comply with EMC radiation requirements, a Class A hub 
must be located 10 m (33 ft.) away from the 1002rp server. 
Shielded Ethernet cables must be used.
„
Install the software feature dongle (see page 73).
„
Connect the power cords for all devices, and then power 
them up.
11
Start the 1002rp server (see page 75).
Step
Description
Check