Nortel Networks Option 11C Mini ユーザーズマニュアル

ページ / 334
Page 139 of 332
Option 11C Mini
Planning and Installation Guide
146
Chapter 11 – Installing the system ground 
This chapter describes how to ground the Option 11C Mini chassis. This 
chapter contains the following procedures:
This chapter also describes how to ground multiple pieces of equipment in a 
rack/cabinet when one or more pieces of equipment does not have a 
grounding lug. See “Grounding multiple pieces of equipment in a 
rack/cabinet” on page 144.
Refer to the “Grounding requirements” on page 47 for additional 
information.
Chassis powered by the same service panel
For each Main Chassis, connect a #6 AWG (#40 Metric Wire Gauge) ground 
wire from the Main Chassis to an NTBK80 grounding block. Connect the 
grounding block to a ground source (the ground bus in the AC service panel).
WARNING
Correct grounding is very important. Failure to complete the 
grounding procedures may
 
result in a system that is unsafe for the 
personnel using the equipment. If your system is not grounded 
correctly, it may not be protected from lighting or power surges, and it 
may be subject to service interruptions.
You must use insulated ground wire for system grounding.