Pre-Installation Guidelines
9
3.4
Connections and System Setup
• Plan the routing of wiring, piping and ductwork to the unit. See Figure 55 and Figures 66 
through 79 for unit connection locations.
• Water/glycol and GLYCOOL units utilizing a drycooler may require an optional aquastat setting.  
See Tables 58 throug57 aquastat setting guidelines.  Applications with the optional stat set-
ting require field piping to be insulated to prevent condensation.
• The unit requires a drain, which must comply with all applicable codes. This drain line may con-
• Three-phase electrical service is required for all models. Electrical service must conform to 
national and local electrical codes. See equipment nameplate for details.
• If seismic requirements apply, consult your local Emerson representative for information about a 
seismic-rated floor stand.
3.5
Operating Conditions
• The Liebert DS must be operated in a conditioned space within the operating envelope ASHRAE 
recommends for data centers: Maximum temperature of 77°F (25°C) DB and 55% RH or maxi-
mum WB of 65.5°F (18.6°C).
Operating outside this envelope can decrease equipment reliability.
• Return air to the unit must be no cooler than the ASHRAE recommendation of 68°F (20°C) DB 
and 40% RH or minimum WB of 54°F (12.2°C) for proper unit operation.
Operating below this can decrease equipment reliability.
Refer to ASHRAE’s publication, “Thermal Guidelines for Data Processing Environments.”