HP (Hewlett-Packard) HP RP7405/7410 ユーザーズマニュアル

ページ / 146
Chapter 2
Installation
Unpacking the Server
26
Unloading with Lift Handle Panels
WARNING
Use this procedure only if no Hewlett-Packard approved lift is available. This 
procedure should only be attempted by two (2) authorized Hewlett-Packard service 
people.
Before attempting this procedure, it is recommended that you first remove all Cell 
Boards and AC power supplies. Instructions for removing these components can be 
found in the Removal and Replacement chapter of the service manual. Check with 
local safety regulations before attempting to move the system using the lift handle 
panels.
Failure to observe these precautions can cause serious injury to personnel or 
damage to equipment.
CAUTION
Unpack the server in an ESD safe environment. Observe all ESD safety precautions before 
attempting this procedure. Failure to follow ESD safety precautions could result in damage to 
the server.
Step 1. Remove both side covers. If present, remove the front panel. 
Step 2. Locate lift handles and remove from storage plate.
Step 3. Orient lift handle panels such that when installed, the handles hang downward at 90 degrees and 
lock in a horizontal position during lifting.
Figure 2-10 Positioning the Lift handles