Motorola SG 2000 ユーザーズマニュアル

ページ / 105
B e n c h S e t u p
3 - 2 3
S G 2 0 0 0 I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l
S G 2 0 0 0 A c t i v a t i o n W o r k s h e e t
This worksheet is provided as a convenient reference to log pertinent information associated with
setting up the SG 2000 node.
Configurator
number
_ _ _/_ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _- _
Technician
_______________
Node number
_______________
Node location
_______________
Date
_______________
Temperature
_______________
Channel load
_______________
Power requirements
Power source
Port 1
Port 2
Port 3
Port 4
Voltage
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
Input/Output
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
Output levels
Port 1
Port 2
Port 3
Port 4
Low Frequency
Level _____
Level _____
Level _____
Level _____
High Frequency
Level _____
Level _____
Level _____
Level _____
ADU frequency
_____
Received optical
power
_____ Vdc
SG2-LR output level
_____
JXP values
Receiver output
pad
Interstage pad
Port 1 pad
Port 2 pad
Port 3 pad
Port 4 pad
Gain reserve
_____ dB
_____ dB
_____ dB
_____ dB
_____ dB
_____ dB
_____ dB
AC powering
AC input power is provided to which port? _____
Is more than one power source used to power the station? _____ yes _____ no
Does the node have an FTEC surge suppressor? _____yes _____ no
Is a second gas-tube surge suppressor required? _____ yes _____ no
Does the node contain one or two power packs? _____
Are fuses removed from output ports that do not require ac power? _____ yes _____no