Multi-Tech Systems 7600 ユーザーズマニュアル

ページ / 372
ION 7500 / ION 7600 User’s Guide
Current Probe Basic Setup
Current Probe Inputs Basic Setup Technical Note
Page 187
To perform current probe basic setup: 
1.
Connect the current probes to the meter (in this example we are using a ION 
7500 meter). Refer to the meter Installation and Basic Setup Instructions for 
current probe installation instructions.
2.
In a Telnet or HyperTerminal session, access the Calibration menu. Refer to the 
technical note titled Telnet and HyperTerminal Access for instructions on how to 
run a Telnet or HyperTerminal session. 
3.
Set up the current probe transformation ratio and the phase angle.
In this example, we will set up a split core CT with AC voltage output. The 
model is CT-300A-0.333V (Nominal Primary current 300A, Nominal secondary 
voltage 0.333V). The phase angle is < 2.0 degrees. This is saved to register group 
“User Defined 1” (1) and is the same for all phase current channels (44). Refer to 
the KCTSTP command in the section “The Calibration menu contains the following 
calibration commands:” on page 188.
To write these parameters to the meter, type in:
7500ION:\PORT_1>kctstp CT-300A-0.333V 300 0.333 2.0 1 44
Press Enter.
4.
To read that the new parameters have been written to the meter, type in:
7500ION:\PORT_1>kctrd
Press Enter.
5.
With the meter front panel or software, activate the current probe parameters set 
in step 3:
Meter front panel: select Basic Setup > Current Probe > User Defined 1
Designer software: access the Power Meter module Current Probe setup 
register and set it to User Defined 1.