ADC 19717-A ユーザーズマニュアル

ページ / 32
ADCP-75-169 • Issue 1 • June 2004
Page 9
© 2004, ADC Telecommunications, Inc.
4.2
Unpacking and Inspection
This section provides instructions for opening the shipping boxes, verifying that all parts have
been received, and verifying that no shipping damage has occurred. Use the following
procedure to unpack and inspect the HU and any accessories: 
1. Open the shipping cartons and carefully unpack each component from the protective
packing material. 
2. Check each component for broken or missing parts. If there are damages, contact ADC
(see section 6 at the end of this manual) for an RMA (Return Material Authorization) and
to reorder if replacement is required. 
4.3
OSP Fiber Cable Installation Guidelines
The outside plant (OSP) fiber optic cables should be routed between the HU and RU and
terminated before the equipment is installed. A diagram of a typical OSP cable routing is shown
in 
. At the HU, the OSP cable should be terminated at a fiber distribution panel and
spliced to pigtails. Jumper patch cords may then be used to link the HU optical ports to the OSP
cable terminations. Whenever possible, a guideway such as the FiberGuide system should be
provided to protect the fiber optic patch cords from damage and to prevent excessive bending.
The procedures for connecting the OSP cable optical fibers to the HU is provided in 
Figure 8. Typical Fiber Optic Cable Routing
HOST UNIT
FIBER DISTRIBUTION
PANEL
X
STM
OUTDOOR
REMOTE SITE
HOST SITE
PATCH
CORDS
PATCH
CORDS
SPLICE
SPLICE
ENCLOSURE
INDOOR/OUTDOOR
CABLE WITH 
PIGTAIL LEADS
OUTSIDE PLANT
CABLE
OUTDOOR
CABINET
18626-B
INDOOR
REMOTE SITE
STM
X
INDOOR
MOUNTING
SHELF
FIBER DISTRIBUTION
PANEL
X
TERMINATION
X