Mitsubishi Electronics A1SJ71AT23BQ ユーザーズマニュアル
5
PREPARATORY PROCEDURES BEFORE
OPERATION
5.2 Preparatory Procedures before Operation
5
- 2
1
O
V
ER
VI
E
W
2
S
YST
EM
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
PR
EP
ARA
T
O
R
Y
PR
O
C
E
DURES
BEF
ORE
OP
E
R
A
T
ION
6
L
INK DA
TA
SEN
D/
RE
C
E
IV
E
P
R
OCE
S
S
ING
A
N
D
P
R
OCE
S
S
ING
T
IME
7
P
R
OGRA
M
MING
8
TR
O
U
BL
ESHO
O
T
IN
G
5.2
Preparatory Procedures before Operation
This section describes the outline of preparatory procedures before operation.
POINT
The link parameter setting (refresh parameter) is not required for a Q series local
station since refresh is performed in a sequence program.
station since refresh is performed in a sequence program.
Figure 5.1 Preparatory procedures before operation
Start
Check prior to power-on
Check prior to power-on
Power-on
Power-on
Local module single check
Local module single check
Connection of cable
Connection of cable
Connect link modules via a cable.
Line check between two stations
Line check between two stations
Link parameter setting for the master station
Link parameter setting for the master station
Set link parameters for the master station.
Type MELSECNET, MELSECNET/B Data
Link System Reference Manual
Link System Reference Manual
Line check (not provided for MELSECNET/B)
Line check (not provided for MELSECNET/B)
Programming for refresh
Programming for refresh
Programming and debug
Programming and debug
END
Set the RUN/STOP switch of the CPU module to
STOP. Check to see if the external power supply
voltage for the power supply module is within the
stipulated range.
STOP. Check to see if the external power supply
voltage for the power supply module is within the
stipulated range.
Turn ON the external power supply. Check to see if
RUN LED of a local module is turned ON.
RUN LED of a local module is turned ON.
Check the hardware of a local module by the self-
loopback test.
loopback test.
Check the line between the two adjacent stations by
the station-to-station test.
the station-to-station test.
Create a program for refresh. Set the RUN/STOP
switch of the CPU module to RUN, and check the
program.
switch of the CPU module to RUN, and check the
program.
Check the forward loop or reverse loop side line of
the MELSECNET.
the MELSECNET.
Create a program for data link and check the
program.
program.
Type MELSECNET, MELSECNET/B Data
Link System Reference Manual
Link System Reference Manual