Samsung SER-6500 ユーザーズマニュアル

ページ / 145
                                                                                                                                                                                
6
SAMSUNG SER6500/40 PROGRAMMING & OPERATING MANUAL
S-POSITION COMMUNICATION TEST
PERFORM ANOTHER STEP
1
1
SBTL
X/TIME
CASH
CODE
EXIT
1 - 5
CODE              FUNCTION                           
1
Test serial port #1 *
2
Test serial port #2 *
3
Test serial port #3 *
4
Test serial port #4 *
5
IRC test
* Requires hardware strap on serial connector
Loop Back Test Connections
1: Serial Ports 1 and 2 (9 Pin D Type)
2: Serial Ports 3 and 4 (Modular)
TXD (3) ------------ RXD (2)
TXD (3) -------------- RXD (4)
DTR (4) ------------ DSR (6)
DTR (8) -------------- DSR (2)
CTS (8)  ------------ RTS (7)
CTS (6) -------------- RTS (5)