American Power Conversion 200/208 V ユーザーズマニュアル

ページ / 52
Operation – Front Panel and Battery Compartment Cover Removal/
990-2359A
Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide 
21
Front Panel installation
Insert the two protrusions at the bottom of the Front Panel into the two slots at the bottom of the 
Enclosure. 
Push the Front Panel into place.
To secure the Front Panel, turn the screw counterclockwise to locked position.