AEG Protect 1.200 ユーザーズマニュアル
54
9
Parallel Operation
9.1
Principle of Operation
PROTECT 1. has been designed for parallel operation with n+x
technology (“n” here stands for the number of units required for
load supply, “x” for the degree of redundancy). Up to 3 units of
the same type can be connected in parallel here to increase the
output power and/or achieve higher availability.
technology (“n” here stands for the number of units required for
load supply, “x” for the degree of redundancy). Up to 3 units of
the same type can be connected in parallel here to increase the
output power and/or achieve higher availability.
NS Hauptverteilung
MI main distribution
USV Einspeisung
UPS feed
Parallelfeld / Handumgehung plus USV
Unterverteilung
Unterverteilung
Parallel field / manual bypass plus UPS
subdistribution
subdistribution