stabilizes  the  load  voltage.  As a result, voltage fluctuations in 
the  public  utility's  mains  are  reduced  to  a  level  which  is 
acceptable  for  the  loads.  This  is  performed  without  recourse 
to  the  internal  energy  storage, something which in turn has a 
positive effect on battery availability.
          UPS block diagram PROTECT B.
The  static  bypass  switch  is  activated  in  the  event  of  a  mains 
failure. The inverter then takes over the voltage supply of the 
connected  loads,  in  order  to  prevent  the  risk  of  data  loss  or 
damage  to  the  loads. PROTECT B. supplies voltage until the 
battery  is  discharged,  allowing  you  to  shut  down  your  IT 
system  properly  and  switch  it  off.  The  standby  time  mainly 
depends on the connected loads. If the mains power supply is 
back  to  normal  values,  the  UPS  will  switch  back  the  loads  to 
mains  supply.  The  battery  charger  will  then  recharge  the 
battery.
For safety reasons (as required by German standards, VDE), 
the mains input in the unit will be disconnected by a two-pole 
switch in the event of a mains failure. Energy backfeed to the 
mains  and  voltage  supply  to  the  pins  of  the  mains  connector 
are thus reliably avoided.
Furthermore,  additional  protective  measures  ensure  effective 
protection for the data/network interface.