INSTALLING OPTIONS AND ACCESSORIES
EATON Powerware
®
9395 UPS (650–825 kVA) Installation and Operation Manual
S
164201725 Rev 2 www.powerware.com
5−9
5.3
Installing an Optional Remote Monitor Panel II
To install RMP II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7, UPS Operating Instructions," for shutdown instructions.
Chapter 7, UPS Operating Instructions," for shutdown instructions.
2.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not
use hollow wall anchors.
use hollow wall anchors.
3.
Securely mount the RMP II at the desired location. See Figure 5-12 on page 5−15
for mounting hole locations.
for mounting hole locations.
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
device and the UPS cabinet.
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or
punch conduit holes (see Figure 4-18 on page 4−20).
punch conduit holes (see Figure 4-18 on page 4−20).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See Figure 5-12 on page 5−15 for
RMP II knockout hole location.
RMP II knockout hole location.
7.
Install wiring between the UPS and RMP II. See Figure 5-2 and Table 5-1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5-7, Figure 5-8, and Table 5-5 for the RMP II terminal location and
wiring information.
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5-7, Figure 5-8, and Table 5-5 for the RMP II terminal location and
wiring information.
NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.
8.
9.
Close the front door and secure the latch.
instructions.