Patton electronic 4400 ユーザーズマニュアル
Introduction
24
SmartNode 4400 Series Getting Started Guide
3 • Hardware installation
Introduction
This chapter contains information for planning the installation of the SmartNode 4400 IpChannel Bank with
the following installation procedures:
the following installation procedures:
•
Section
ping box
•
Section
on page 27 describes installing the IpChannel Bank on a flat
surface or in a 19-inch rack
•
Section
on page 28 describes installing the power and port cables
•
Section
on page 30 describes how to verify that the IpChannel Bank is ready for con-
figuration
Planning the installation
Before beginning the actual installation, we strongly recommend that you gather all the information you will
need to install and set up the device. See
need to install and set up the device. See
for a smoother installation. Completing the pre-installation checks enables you to install and set up your
IpChannel Bank within an existing network infrastructure with confidence.
IpChannel Bank within an existing network infrastructure with confidence.
Before installing the IpChannel Bank device, the following tasks should be completed:
•
Prepare an installation checklist using the list provided in section
•
Initiate and mantain a site log using the information in section
•
Create a network diagram (see section
•
Gather IP related information (see section
on page 26 for more information)
•
Install the hardware and software needed to configure the SmartNode. (See section
•
Verify power source reliability (see section
“Power source”
on page 27).
When you finish preparing for your VoIP installation, go to section