Patton electronic 2701/I ユーザーズマニュアル

ページ / 32
2
CONTENTS
1.0
Warranty & Compliance Information ........................................  4
1.1
Compliance ...................................................................................  4
EMC Compliance..........................................................................  4
Safety Compliance: ......................................................................  4
PSTN Regulatory Compliance:.....................................................  4
1.2
CE Notice......................................................................................  5
1.3
Authorized European Representative ...........................................  5
1.4
Service ..........................................................................................  5
1.5
Safety When Working With Electricity ..........................................  6
2.0
General Information....................................................................  7
2.1
Features........................................................................................  7
2.2
Description ....................................................................................  7
3.0
PPP Operational Background....................................................  9
3.1
Applications ..................................................................................  9
4.0
Configuration ............................................................................  11
4.1
DIP Switch Configuration ............................................................  11
Switch SW1 ................................................................................  12
Switch SW-1 through SW1-5 ............................................... 12
SW1-6 and SW1-7 Clock Modes ......................................... 13
Switch SW2 ................................................................................  14
Switch SW2-1 Line Coding: HDB3 (default) ........................ 14
Switch SW2-2: CRC-4 Multiframe  ....................................... 15
Switch SW2-3 Data Inversion .............................................. 15
Switch SW2-4: Remote Digital Loopback Type ................... 15
Switch SW2-5 Front Panel Switches ................................... 16
Switch SW2-6: V.54 Response Disabled (default)  .............. 16
5.0
Installation .................................................................................  17
5.1
Connecting to the G.703 Network...............................................  17
Connecting Dual Coaxial Cable (75 ohm) to the G.703 Network  17
Opening the Case.......................................................................  18
Connecting the Twisted Pair (120 ohm) to the G.703 Network ..  18
5.2
Connecting the 10Base-T Ethernet Port to a PC (DTE) .............  19
5.3
Connecting the 10Base-T Ethernet Port to a Hub ......................  19
5.4
Power Connection ......................................................................  20
Universal AC Power (100–240 VAC)..........................................  20
DC Power ...................................................................................  20
6.0
Operation ...................................................................................  21
6.1
Power-up ....................................................................................  21
6.2
LED Status Monitors ...................................................................  21
6.3
Loop (V.54 & Telco) Diagnostics ................................................  23
Operating Local Loopback (LL) ..................................................  23
Operating Remote Digital Loopback (RL)...................................  24
CSU Loop ...................................................................................  24
Using the V.52 (BER) Test Pattern Generator ...........................  25