3com S330 ユーザーズマニュアル
2
I
NSTALLATION
This chapter tells you how to mechanically and electrically install SuperStack
®
II
PathBuilder
®
S330 and SuperStack
®
II PathBuilder
®
S310 WAN access switches
(PathBuilder S330/S310) in your network and describes the PathBuilder S330/S310
ports and modules. It contains the following sections:
ports and modules. It contains the following sections:
n
n
n
Before using this chapter for an actual installation, read through it at least once to
familiarize yourself with the overall process.
familiarize yourself with the overall process.
Receiving and
Inspecting the
PathBuilder S330/S310
Inspecting the
PathBuilder S330/S310
When you receive the PathBuilder S330/S310, do the following:
1 Unpack and inspect the PathBuilder S330/S310 equipment for any damage that
might have occurred during shipment.
2 Inventory the equipment against the shipping notice.
3 Save the boxes and packing materials in the event there is damage or in case you
need to reship the unit at a future date.
4 If anything is damaged or missing, contact the shipper and 3Com immediately.
CAUTION: Many of the integrated circuits on the modules are sensitive to static
electricity. Do not remove the plug-in modules from their shelves without wearing
a properly-grounded antistatic wrist strap.
electricity. Do not remove the plug-in modules from their shelves without wearing
a properly-grounded antistatic wrist strap.