HP (Hewlett-Packard) A7540-96010 ユーザーズマニュアル

ページ / 70
Installing
28
Installing and initially configuring the switch
Installing a 2/8q FC Switch involves the following steps, each of which is discussed in the 
following sections:
Unpack the switch and verify carton contents
The 2/8q FC Switch is shipped with the components shown in 
.
Figure 5:  Switch carton contents
1
2/8q FC Switch
2
2/8q FC Switch Quick Start Installation Instructions (printed) 
3
Power cable (approved for use in the United States) 
4
Mounting adapter brackets 
5
Screws for the mounting adapter brackets (6)
6
Rubber feet (4)
7
Small Form Factor Pluggable (SFP) transceivers (4)
1
3
2
7
6
4
5