HP (Hewlett-Packard) 2610 ユーザーズマニュアル

ページ / 112
2-9
Installing the Switch
Installation Procedures
In
sta
llin
g
 th
e
 Sw
itc
h
3. Mount the Switch
After the switch passes self test, it is ready to be mounted in a stable location. 
The 2610 Switches can be mounted in these ways:
Rack or Cabinet Mounting
The 2610 Switches are designed to be mounted in any EIA-standard 19-inch 
telco rack or communication equipment cabinet. Note that the mounting 
brackets have multiple mounting holes and can be rotated allowing for a wide 
variety of mounting options. Secure the rack in accordance with the 
manufacture’s safety guidelines. 
W A R N I N G
For safe operation, please read the mounting precautions on
, before mounting a switch.
E q u i p m e n t  
C a b i n e t  
N o t e
The 12-24 screws supplied with the switch are the correct threading for 
standard EIA/TIA open 19-inch racks. If installing the switch in an equipment 
cabinet such as a server cabinet, use the clips and screws that came with the 
cabinet in place of the 12-24 screws that are supplied with the switch.
Mounting Location
Non-PWR Switches 
PWR Switches
In a rack or cabinet
Yes
Yes
On a horizontal surface
Yes
Yes
On a wall 
Yes
No