Siemens Module B3 ユーザーズマニュアル
Automation and Drives - SCE
T I A Training Document
Page 41 of 64
Module
3. Generate a new project, select a path and assign a project name (
→ User projects →
PID_Control
→ OK)
Enter project
name
name
Cick 'OK'
Select storage
location (path)
location (path)
Select 'User
Projects’
Projects’
4.
Insert the SIMATIC 300 station (
→ Insert → Station → SIMATIC 300 Station)
Click on 'SIMATIC 300
Station'
Station'
Preface Fundamentals Discontinuous Action Controllerr Controller Block (S)FB41 Setting the System Appendix
B3
Issued: 02/2008 Control Engineering with STEP 7