HP (Hewlett-Packard) ML330 G6 ユーザーズマニュアル

ページ / 137
 
Hardware options installation  57 
Be sure to thread the cables through the rear of the non-hot-plug expansion cage into the server. 
 
9. 
Connect the cables to the SATA connectors 1-4 on the system board ("
" o
page 
). 
10. 
Install the air baffle. 
11. 
Install the access panel (on page 
). 
12. 
Do one of the following: 
Close or install the tower bezel, as needed. 
Slide the server back into the rack. 
13. 
Power up the server (on page 
). 
 
Removable media devices 
This section provides the following information and procedures: 
• 
Identifying guide screws (on page 
) 
• 
SATA optical drive option (on page 
) 
• 
USB tape drive option (on page 
) 
• 
Full-height tape drive option (on page 
)