HP (Hewlett-Packard) BL25P ユーザーズマニュアル

ページ / 118
 
 17 
 
 
Operations 
In This Section 
Power Up the Server Blade ..........................................................................................................
Power Down the Server Blade......................................................................................................
Remove the Server Blade .............................................................................................................
 
 
Power Up the Server Blade 
By default, the server blade is set to power up automatically when installed in the 
server blade enclosure. Be sure the server blade is compatible with the server 
blade enclosure. Refer to "Server Blade Enclosure Compatibility (on page 
If the default setting is changed, use one of the following methods to power up 
the server blade: 
• 
Power On/Standby button 
− 
A momentary press initiates a power-up request. The server blade 
determines power availability from the power subsystem. If required 
power is available, the server blade powers up. 
− 
A press of 5 seconds or more initiates a power-up override. The server 
blade powers up without power availability detection from the system. 
  CAUTION:  Always observe iLO alerts before initiating a 
power-up override to prevent a hot-plug power supply fault and possible 
loss of system power. For more information, refer to the HP Integrated 
Lights-Out User Guide
NOTE:  You can perform a server blade power-up override when the 
management modules are not in use to manage the power-up request. 
Be sure that sufficient power is available. 
• 
Virtual power button features through iLO 
− 
A momentary power-up selection 
− 
A hold power-up selection