Chapter 3
Installing the System
Setting Up the System
108
Voltage Check 
The voltage check ensures that all phases (and neutral, for international systems) are wired correctly for the 
cabinet and that the AC input voltage is within limits.
NOTE
If a UPS is used, refer to applicable UPS documentation for information to connect the server 
and to check the UPS output voltage. UPS User Manual documentation is shipped with the 
UPS. Documentation may also be found at http://docs.hp.com
Step 1. Verify that site power is 
OFF
.
Step 2. Open the site circuit breaker(s).
Step 3. Verify that the receptacle ground connector is connected to ground. See Figure 3-30 for connector 
details.
Step 4. Set the site power circuit breaker to 
ON
.
Figure 3-30 Wall Receptacle Pinouts
Step 5. Verify that the voltage between receptacle pins x and y is between 200 - 240 volts AC. 
Step 6. Set the site power circuit breaker to 
OFF
.
Step 7. Ensure that power is removed from the server. 
Step 8. Route and connect the server power connector to the site power receptacle.
For locking type receptacles, line up the key on the plug with the groove in the receptacle.
Push the plug into the receptacle and rotate to lock the connector in place.
WARNING
Do not set site AC circuit breakers serving the processor cabinets to 
ON
 
before verifying that the cabinet has been wired into the site AC power 
supply correctly. Failure to do so may result in injury to personnel or 
damage to equipment when AC power is applied to the cabinet.
Step 9. Set the site power circuit breaker to 
ON
.