Fujitsu TX300 ユーザーズマニュアル
![Fujitsu](https://files.manualsbrain.com/attachments/6c4642b33d2edbd09f94719c20a133aa0e862902/common/fit/150/50/80a45702a21fefb1823bce6851e87db450dccf7792cb572ebc8a90330a68/brand_logo.png)
TX300 S6
Options Guide
79
Expansion cards and BBU
Installing a BBU
8.2
Installing a BBU
V
CAUTION!
●
Do not connect the cable using excessive force, the connector is
weak.
weak.
●
Follow the safety instructions in the
The Battery Backup Unit (BBU) backs up the memory contents of the SAS/SATA
RAID controller in the event of a power failure.
RAID controller in the event of a power failure.
One BBU can be installed for each SAS/SATA RAID controller. A maximum of
three BBUs can be installed for each system.
three BBUs can be installed for each system.
Ê
Open the server and remove the fan carrier as described in the
Figure 51: Removing the BBU carrier plate
Ê
Loosen the screw and remove the BBU carrier plate from the housing.