Fujitsu N800 ユーザーズマニュアル

ページ / 142
22
 
 U41243-J-Z156-1-76
Mounting the server in the rack
Installing the server
Ê
Pull the left mounted telescopic rail out as far as it will go and then mount it 
to the appropriate carrier with the screws.
Ê
Repeat this procedure for the right telescopic rail.
Figure 4: Mounting the system brackets
Ê
Mount the system brackets on the two telescopic rails.
Ê
Pull the mounted telescopic rails out completely. They must click into place 
so that you can no longer push them back.
I
It takes more than one person to lift the storage subsystem into the rack.