Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-458
DIOD-DS1 (DS1 DIOD Trunk) 
10
Port Audit and Update Test (#36)
This test sends port level translation data from switch processor to the DS1 
Interface circuit pack to assure that the trunk’s translation is correct. Translation 
updates include the following data: trunk type (in/out), dial type, timing 
parameters, and signaling bits enabled. The port audit operation verifies the 
consistency of the current state of trunk kept in the DS1 Interface circuit pack 
and in the switch software.
FAIL
The NPE of the tested port did not conference the tones correctly. This will 
cause noisy and unreliable connections.
1. Replace the circuit pack.
PASS
The port can correctly conference multiple connections. User-reported 
troubles on this port should be investigated by using other port tests and 
by examining station, trunk, or external wiring.
Table 10-151.
TEST #36 Port Audit and Update Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Internal System Error
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to abort, escalate the problem.
2000
ABORT
Response to the test request was not received within the allowable time 
period.
2100
ABORT
Could not allocate the necessary system resources to run this test.
Continued on next page
Table 10-150.
TEST #7 Conference Circuit Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page