Lucent Technologies lucent ユーザーズマニュアル
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-687
HYB-LINE (Hybrid Line)
10
Hybrid Line Local Digital Loop Around Test (#58)
This test checks the control channel between the SPE and the port’s digital
circuitry. The SPE sends transparent data to the on-board microprocessor and
compares the data echoed back. This test is repeated three times.
circuitry. The SPE sends transparent data to the on-board microprocessor and
compares the data echoed back. This test is repeated three times.
0
NO
BOARD
BOARD
The test could not relate the internal ID to the port (no board). This could
be due to incorrect translations, no board is inserted, an incorrect board is
inserted, or an insane board is inserted.
be due to incorrect translations, no board is inserted, an incorrect board is
inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the
list
config
command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the
busyout board
command.
3. Issue the
reset board
command.
4. Issue the
release busy board
command.
5. Issue the
test board long
command. This should re-establish the
linkage between the internal ID and the port. If this is not the case,
dispatch to check to ensure that there is a valid board inserted.
dispatch to check to ensure that there is a valid board inserted.
Table 10-229.
TEST #58 Hybrid Line Local Digital Loop Around Test
Error
Code
Code
Test
Result
Description/ Recommendation
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-228.
TEST #57 Hybrid Circuit and Conference Circuit Test —
Continued
Error
Code
Code
Test
Result
Description/ Recommendation
Continued on next page