Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-687
HYB-LINE (Hybrid Line) 
10
Hybrid Line Local Digital Loop Around Test (#58)
This test checks the control channel between the SPE and the port’s digital 
circuitry. The SPE sends transparent data to the on-board microprocessor and 
compares the data echoed back. This test is repeated three times.
0
NO 
BOARD
The test could not relate the internal ID to the port (no board). This could 
be due to incorrect translations, no board is inserted, an incorrect board is 
inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the 
list 
config
 command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the 
busyout board
 command.
3. Issue the 
reset board
 command.
4. Issue the 
release busy board
 command.
5. Issue the 
test board long
 command. This should re-establish the 
linkage between the internal ID and the port. If this is not the case, 
dispatch to check to ensure that there is a valid board inserted.
Table 10-229.
TEST #58 Hybrid Line Local Digital Loop Around Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-228.
TEST #57 Hybrid Circuit and Conference Circuit Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page