Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-970
PI-PT (Processor Interface Port) 
10
Notes:
a. PI-LINK raised this alarm against PI-PT. The Processor Interface Loop 
Around test failed on one of the ports. Refer to PI-LINK Maintenance 
documentation for details on resolving this alarm. If this error resulted in an 
SPE-interchange, then issue the 
test interface PCS sh
 command on the 
Standby Processor Interface to try to resolve the alarm.
b. This error type indicates that the circuit pack has been removed or has 
been insane for more than 11 minutes. To clear the error, reinsert or 
replace the circuit pack.
System Technician-Demanded Tests: 
Descriptions and Error Codes
PI-PT can be tested by issuing the 
test interface PCS
 command on the Standby 
Processor Interface circuit pack. If the Active TN765 Processor Interface circuit 
pack is tested, then the active test sequence is run (
which is DESTRUCTIVE
). 
[Refer to PI-SCI (System Communication Interface) Maintenance documentation 
for details on these tests]. Only the Standby Processor Interface test sequence 
runs tests directly on PI-PT.
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Standby Processor Interface Port Test
, for example, you may also clear errors 
generated from other tests in the testing sequence.
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
130 (b)
None
257 (a)
Any
None
MAJOR
ON
test link lnk-no l
Table 10-327.
Processor Interface Port PI-PT Error Log Entries  — 
Continued
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
Continued on next page