Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-987
PKT-BUS (Packet Bus) 
10
The Packet Bus port has been busied out (indicated by an Error 
Type 18), and a Warning alarm is active in the same port network. 
Release the port by entering the 
release port PCSS04
 command.
The Packet Bus port has failed. Resolve any alarms.
The Maintenance/Test circuit pack was not recognized by the 
system at the last system restart. Replace the Maintenance/Test 
circuit pack. There is no Maintenance/Test circuit pack installed in 
this port network. One must be installed.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the following tables when you 
are inspecting errors in the system. By clearing error codes associated with the 
Packet Circuit Pack Audit Test,
 for example, you may also clear errors generated 
from other tests in the testing sequence.
Packet Control Bus Loop Around Test (#571)
This test uses circuitry on the Packet Control circuit pack (TN778) to look for 
faults on the Packet Bus. If the Packet Control circuit pack has detected parity 
errors on the Packet Bus, or if it is unable to loop back data to itself, the test fails. 
The test passes if no parity errors are detected and if data is successfully looped 
back.
This test provides information only for the PPN of a standard system. If the test is 
run in an EPN or in the PPN of a High or Critical Reliability system, the test aborts.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Packet Circuit Pack Audit Test (#573) 
X
X
ND
Maintenance/Test Circuit Pack Query Test (#572)
X
X
ND
Packet Control Bus Loop Around Test (#571)
X
X
ND