DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1009
PMS-LINK (Property Management System Link) 
10
Procedures for Restoring the PMS Link
1. Determine the status of the PMS Link.
Enter 
status pms
 command and make sure that the PMS Link is not 
busied out for maintenance. If the link is "down," then continue with the 
next step.
2. Where does the PMS Link connect?
Enter 
display system hospitality
 and find out the destinations of the PMS 
Link.
3. Determine the status of the data extension.
Enter 
status data <extension>
 command and verify whether the data 
extension is in in-service/idle state. If the data extension is NOT available, 
then look for the extension number in Alt Name field of Hardware Error 
Log. Refer to the XXX-BD (Common Port Circuit Pack) Maintenance 
documentation for resolutions.
4. Is a data channel on Network Control circuit pack in in-service/idle state?
Enter 
list data
 command and find out the extension numbers of data 
channels on Network Control circuit pack. Enter 
status data <extension>
 
command and make sure that at least one data channel is in 
in-service/idle state. If no data channel is available, then look for 
DATA-CHL/DATA-CON/DATA-BD errors in the Hardware Error Log. If 
present, refer to the DATA-BD (Network Control Circuit Pack) Maintenance 
documentation; if not present, escalate the error.
5. Is the external PMS device available?
Make sure that the PMS device is ON-LINE and ready for service. Check 
the physical connectivity between Data Module and the PMS device.
It is recommended that you busy out the PMS Link before executing maintenance 
tests over objects composing the PMS Link. If the PMS Link is busied out, then all 
PMS Link maintenance actions are deactivated. The interference to tests of other 
MO is off.