Routine Maintenance Procedures 
Page 5-74
Install DS1 CPE Loopback Jack (T1 Only) 
5
Loopback Jack Fault Isolation Procedures
This section describes the possible DS1 configurations in which the loopback 
jack may be used. These configurations are: when the DS1 provider includes a 
Smart Jack, when no Smart Jack is provided at all, and when sites use fiber 
multiplexers. These configurations are separated into “Configurations Using a 
Smart Jack” and “Configurations Without a Smart Jack.” 
Configurations Using a Smart Jack
The addition of the loopback jack and the presence of a Smart Jack divides the 
DS1 span into 3 separate sections for fault isolation. These sections are shown in 
 throug
 for the different span configurations. They are:
Section 1: Between the 120A2 (or later) ICSU and the loopback jack. 
Section 2: Between the loopback jack and the Smart Jack (network interface
point).
Section 3: From the Smart Jack to the CO. It is necessary to contact the DS1
provider to run this test. 
A problem can exist in 1 or more of the 3 sections. The field technician is 
responsible for finding and correcting problems in the first 2 sections. The DS1 
service provider is responsible for finding and correcting problems in the third 
section. Testing is divided into 3 steps. 
Test customer premises wiring (section 1 in the following 3 figures) from 
the ICSU to the loopback jack as described in “DS1 Span Test.”
Test the CO-to-network interface wiring (section 3 in 
) using the 
Smart Jack loopback (CO responsibility). Coordinate this test with the DS1 
provider.
Test the short length of customer premises wiring (section 2 in the 
following 3 figures) between the loopback jack and the Smart Jack. This 
can be done using a loopback that “overlaps” section 2 of the cable. Any 
of the following loopbacks can do this:
a. The local ICSUs line loopback, which is typically activated, tested, 
and then deactivated by the DS1 service provider at the CO end. 
b. The local DS1 interface’s payload loopback, activated and tested 
by the DS1 service provider at the CO end. 
c. The far-end ICSU’s line loopback. This test is activated at the 
management terminal by entering 
test ds1-loop <location> 
far-csu-loopback-test-begin
. The test is terminated by entering 
test ds1-loop <location> end-loopback/span-test
. Bit error 
counts are examined as described in “DS1 Span Test.” This test 
method is the least preferable because it covers wiring that is not in 
the local portion of the span. This test only isolates problems to