Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1081
PROCR (Processor Circuit Pack) 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when you are 
inspecting errors in the system. By clearing error codes associated with the 
Processor Non-maskable Interrupt Test,
 for example, you may also clear errors 
generated from other tests in the testing sequence.
Notes:
a. Refer to PR-MAINT (Maintenance/Tape Processor) Maintenance 
documentation for a description of these tests.
b. Refer to MEMORY [386 systems only] Maintenance documentation for a 
description of these tests.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Processor Non-maskable Interrupt Test (#82)
X
X
ND
Processor ROM Checksum Test (#80)
X
X
ND
Processor Software Initiated Interrupt Test (#77)
X
X
ND
Processor Sanity Timer Test (#83)
X
D
MTP Outpulse Relay Test (#102) (a)
X
X
ND
MTP Analog Loop Around Test (#103) (a)
X
X
ND
MTP Sanity Handshake Test (#106) (a)
X
X
ND
MTPSAT Loop Around Test (#228) (a)
X
X
ND
MTP Aux Loop Around Test (#229) (a)
X
X
ND
MTP Reset Test (#101) (a)
X
D
MTP Dual Port Ram Test (#104) (a)
X
D
Read All Memory Test (#85)(b)
X
ND
Memory Error Detection Test (#87)(b)
X
X
ND
Text Checksum Test (#86)(b)
X
ND
Memory Functional Test (#332) (c)(b)
X
D
Memory Board Check Test (#631) (b)
X
X
ND