Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1228
SYS-PRNT (System Printer) 
10
Link Tear Down Test (#213)
This test is destructive.
The Link Tear Down Test disconnects the existing link between DEFINITY 
Generic 1 and the external SYS-PRNT output device. If the link has been 
disconnected already, this test just returns PASS. All resources allocated for a 
System Printer Link are released after this test.
Link Retry Test (#215)
The Link Retry Test sends a message to the SYS-PRNT software process either 
(1) to make a data call to the extension to which the SYS-PRNT output device 
connects OR (2) to open the EIA port to the SYS-PRNT output device. If the 
System Printer Link is already up, this test passes without making a data call or 
opening the EIA port.
Table 10-423.
TEST #213 Link Tear Down Test 
Error 
Code
Test 
Result
Description/ Recommendation
40, 50
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
1010
ABORT
The System Printer Link has been busied out.
1. Enter the 
release sp-link
 command to release the System Printer Link 
from the busyout state.
2. Reissue the 
test sp-link long
 command to execute the test.
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
PASS
The System Printer Link is torn down or a Short Test Sequence was 
executed and the link was not torn down.
Continued on next page
Table 10-424.
TEST #215 Link Retry Test 
Error 
Code
Test 
Result
Description/ Recommendation
10, 20
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
Continued on next page