Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Reliability Systems: A Maintenance Aid 
Page 6-27
Repair Procedures for High and Critical Reliability 
6
Additional Tests for Replaced DATA-CHL,
PKT-CTRL, and PROCR Circuit Packs
After 
all
 affected circuit packs have been replaced, if the replaced circuit packs 
include the TN777B Network Control circuit pack(s), the TN778 Packet Control 
circuit pack(s), or the Processor circuit pack(s), additional testing is required to 
ensure that the new circuit packs are healthy. This testing must be done on these 
circuit packs when they are located in the Active SPE. Issue the 
status system
 
command to determine which SPE is currently the Active SPE and determine the 
SPE, Active or Standby, in which each replaced Network Control, Packet Control, 
and/or Processor circuit pack resides.
If any of the replaced circuit packs are located in the Active SPE, test it by 
issuing the 
test network-control [a | b]
test packet-control [a | b]
, or 
test 
processor [a | b]
 command, as appropriate. If any tests fail or abort, refer to the 
SW-CTL (Switch Control), DATA-CHL (Network Control Data Channel), 
PKT-CTRL (Packet Control Circuit Pack, DATA-BD (Network Control Circuit 
Pack), or PROCR, and PR-MAINT (Maintenance/Tape Processor) Maintenance 
documentation in 
, a
appropriate.
If any of these circuit packs are located in the Standby SPE, force the Standby 
SPE to become the Active SPE as described in "Upgrading SPE Circuit Packs." 
However, before the Standby SPE is made to become the Active SPE, the 
replaced circuit pack should first be tested while on the Standby SPE. Then, test 
these circuit packs (that are now located in the Active SPE) by issuing the 
test 
network-control [a | b]
test packet-control [a | b]
, or 
test processor [a | b]
 
command, as appropriate. If any tests fail or abort, refer to the SW-CTL (Switch 
Control), DATA-CHL (Network Control Data Channel), DATA-BD (Network Control 
Circuit Pack), PKT-CTRL (Packet Control Circuit Pack), or PROCR, and 
PR-MAINT (Maintenance/Tape Processor) Maintenance documentation in 
, as appropriate.
!
WARNING:
Before leaving the system, verify that the SPE Select Switches have been 
returned to their proper position. The switches should be in the AUTO 
position and the SPE Select Switch LEDs should be off on both the TN772 
Duplication Interface circuit packs.
See the following flowchart, 
, for the 
procedure for installing or replacing Standby SPE Circuit Packs in Duplication 
Option System.