Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-344
test environment 
8
Feature Interactions
The long test recycles power in some specified cabinet on non-SPE and 
maintenance board carriers and is destructive. Specifically, the ’a’ carrier of 
PPNs and EPNs does not have power recycled. In PPNs containing duplicated 
SPEs the ’b’ carrier also does not have power recycled. All port carriers are 
recycled, and service is interrupted for each port carrier. If a carrier containing 
an active EI is recycled, communication with that cabinet is disrupted. If a carrier 
containing an active tone-clock board is recycled, all ports in the cabinet or port 
network are service disrupted.
1.
If no alarms are registered against the maintenance object then the test sequence is run only once. The
 long clear
 option 
forces a clear of all alarms if no errors are encountered during testing. The 
short clear
 option only clears alarms pertinent 
to tests in the short sequence.
2.
Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Object
Qualifier
Qualifier Description
Permissions
Defaults
Feature
Interactions
test environment
location
short
long
repeat 
number
clear
schedule
Cabinet (1-3); 1 = PPN, 2-3 = 
optional EPN.
Option for a brief series of 
nondestructive diagnostic tests.
Option for a longer, more 
comprehensive series of both 
destructive and nondestructive 
diagnostic tests.
How many times each test in the 
sequence is repeated (1-100)
This option causes the test 
sequence (short or long) to repeat 
until the alarm (if any) is cleared or 
a single test in the sequence fails.
1
Command is validated and then a 
scheduling form displays to 
schedule execution of the 
command. The command is then 
placed in the command queue and 
is executed at the specified time. 
The information displayed by the 
command is sent to the system 
printer instead of the screen.
2
Examples:
test environment
test environment schedule
test environment 1 sh
test environment 1 l r 25
test environment 01 l r 25
test environment 01 l r 25 
schedule
test environment 2 l c
test environment 3 c
init
inads
craft
Cabinet = 1;
test sequence 
= short; repeat 
= 1
See below