Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-396
test tdm 
8
test tdm
This command tests all the time slots on a bus associated with a PPN or an EPN.
1.
If no alarms are registered against the maintenance object then the test sequence is run only once. The
 long clear
 
option forces a clear of all alarms if no errors are encountered during testing. The 
short clear
 option only clears 
alarms pertinent to tests in the short sequence.
2.
Refer to the Report Scheduler and System Printer feature specification for more details.
Action/ 
Object
Qualifier
Qualifier Description
Permissions
Defaults
Feature
Interactions
test tdm
pn number
short
long
repeat number
clear
schedule
nn
 = number of the port network to 
have its TDM bus tested. Both 
halves (“a” and “b”) of the TDM 
bus are tested.
Option for a brief series of 
nondestructive diagnostic tests.
Option for a longer, more 
comprehensive series of both 
destructive and nondestructive 
diagnostic tests.
How many times each test in the 
sequence is repeated (1-100)
This option causes the test 
sequence (short or long) to repeat 
until the alarm (if any) is cleared or 
a single test in the sequence fails.
1
Command is validated and then a 
scheduling form displays to 
schedule execution of the 
command. The command is then 
placed in the command queue and 
is executed at the specified time. 
The information displayed by the 
command is sent to the system 
printer instead of the screen.
2
Examples:
test tdm port-network 1 l 
test tdm port-network 2 sh r 2
test tdm port-network 2 sh sch
test tdm port-network 1 l r 25
test tdm port-network 2
test tdm port-network 1 c
init
inads
craft
Test 
Sequence 
= short; 
Repeat = 1
none