Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-136
ASAI-PT 
10
c. The port received an invalid frame over the D-channel. When the Cyclical 
Redundancy Check (CRC) errors exceed 5 within 15 minutes, the port is 
taken out of service for 5 seconds. If 5 more CRC errors are received 
within 15 minutes of the first set of 5 errors, the port is taken out of service 
for one minute. If 5 more CRC errors are received within 15 minutes of the 
last 5, the port is taken out of service for 15 minutes.
This error is most likely due to a problem with the wiring to the set or 
adjunct, interference on the wiring due to a noise source, or no termination 
(an open circuit). It usually does not indicate a problem with the circuit 
pack.
Check the wiring to the endpoints or the adjunct.
If the problem persists, replace the endpoints or adjuncts.
d. This error occurs when a Layer 1 Transmission error is detected for the 
port. Run the Long Test Sequence and note the results of the Layer 1 
Transmission Error Counter Test (#624).
e. This error occurs when the circuit pack detects an overflow of its receive 
buffers. Run the Long Test Sequence and note the results of the Receive 
FIFO Overflow Counter Test (#625).
f. This error occurs when the BRI Port Local LAN Looparound Test (#618) 
fails. Run the Long Test Sequence and note the results of Test (#618).
g. The Terminal Endpoint Identifier (TEI) administered for the ASAI endpoint 
most likely does not match the TEI administered in the ASAI adjunct. 
Check the switch administration of the TEI against that of the adjunct, and 
make sure that both are using the same TEI.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the following tables when 
inspecting errors in the system. For example, by clearing error codes associated 
with the NPE Crosstalk Test, you may also clear errors generated from other tests 
in the testing sequence.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
ASAI Port Local LAN Looparound Test (#618)
X
D
Level 1 Status Inquiry Test (#621)
X
X
ND
CRC Error Counter Test (#623)
X
ND
Layer 1 Transmission Error Counter Test (#624)
X
ND
Receive FIFO Overflow Error Counter Test (#625)
X
ND
Clear Error Counters (#270)
X
X
ND