Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
Initialization and Recovery 
Page 4-1
 
4
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
4
4
Initialization and Recovery
When the system is powered up, or when it experiences a catastrophic fault that 
interrupts its basic functions, the system undergoes a reboot. Besides “reboot,” 
there are several less severe resets available to the system that allow it to recover 
from disrupting errors. The user can initiate these resets by using the reset 
system commands. These commands are used to manually restart the system at 
various levels, depending on the required test activity. The reset system 
commands are discussed in 
.
A system is reset due to a loss of power, or via one of the following:
Reset commands at the administration terminal.
Maintenance software, from which the system can reset itself. (This 
process starts when certain software and hardware errors are detected by 
the software.)
“Interchange,” which is a type of reset that can be scheduled as part of 
daily maintenance in High or Critical Reliability systems.
!
WARNING:
When the system is rebooted or reset at level 2, 3, 4, or 5, all voice 
terminal and attendant console features are adversely affected. 
Users should be advised of services that are lost and that, as a 
result, must be reactivated. See “Removing Power” in 
The administration terminal display and circuit pack LEDs indicate the progress 
of the recovery process. LEDs are discussed in 
The sections that follow discuss successful system resets. For each level of 
reset, a typical administration terminal display is provided. Note that any