Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-254
CARR-POW (Carrier Port Power Unit) for AC-Powered Systems 
10
4. Before installing the replacement power unit in the carrier, turn the power 
unit on its side and operate rocker switches 1 through 4 on the dip switch 
as follows:
NOTE:
In the open position, the rocker is down on the side opposite the 
number. In the closed position, the rocker is down on the side 
adjacent to the number.
5. Move the locking slide on the replacement power unit to the extreme left 
position and open the locking lever.
6. Insert the power unit into the carrier until some resistance is felt.
7. Lift the locking lever upward until it latches.
8. Move the locking lever slide on the power unit to the extreme right 
position.
9. Connect the power cord and set the power switch to ON.
Replacing a 631DA or 631DB AC Power Unit
If the power unit to be replaced is in a control carrier of a PPN system, refer to 
"Removing Power" and "Restoring Power" in Chapter 5, "Routine Maintenance 
Procedures" before replacing the power unit. To replace the power unit, follow 
the procedure below:
1. Unplug the power cord.
2. Move the locking slide on the power unit to the extreme left position and 
unlatch the locking lever.
3. Remove the power unit from the carrier.
4. Move the locking slide on the replacement power unit to the extreme left 
position and open the locking lever.
5. Insert the power unit into the carrier until some resistance is felt.
6. Lift the locking lever upward until it latches.
7. Move the locking lever slide on the power unit to the extreme right 
position.
8. Connect the power cord and set the power switch to ON.
Switch
631AR Position
631BR Position
1
open
open
2
closed
closed
3
open
open
4
closed
open