Lucent Technologies lucent ユーザーズマニュアル
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-257
CARR-POW (Carrier Port Power Unit) for AC-Powered Systems
10
Power Unit Recycle Test (#126)
This test is destructive.
This test is destructive because it requires all circuit packs in the recycled carrier
to be removed and inserted. These actions cause all calls originating or
terminating on circuit packs in this carrier to be dropped. The pair of power units
in the specified carrier is recycled. Both power units in the carrier are turned off
for two seconds and then back on again. After the power units have been turned
back on, the test queries the Maintenance/Tape Processor in Standard system
PPN, the Duplication Interface circuit pack in a PPN for a system with High or
Critical Reliability, or the EPN Maintenance circuit pack in an EPN multicarrier
cabinet system for the status of pair of power units in the specified carrier. If both
power units are on and functioning, then the test passes. If both power units are
not on and functioning, the test fails, and BOTH power units are turned off.
to be removed and inserted. These actions cause all calls originating or
terminating on circuit packs in this carrier to be dropped. The pair of power units
in the specified carrier is recycled. Both power units in the carrier are turned off
for two seconds and then back on again. After the power units have been turned
back on, the test queries the Maintenance/Tape Processor in Standard system
PPN, the Duplication Interface circuit pack in a PPN for a system with High or
Critical Reliability, or the EPN Maintenance circuit pack in an EPN multicarrier
cabinet system for the status of pair of power units in the specified carrier. If both
power units are on and functioning, then the test passes. If both power units are
not on and functioning, the test fails, and BOTH power units are turned off.
Table 10-87.
TEST #126 Power Unit Recycle Test
Error Code
Test
Result
Description/ Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at one-minute intervals a maximum of five
times.
2. If the test continues to abort, escalate the problem.
1129
ABORT
Only occurs when recycling carrier 2B. Indicates that the Active
Tone-Clock for the EPN is in carrier 2B.
Tone-Clock for the EPN is in carrier 2B.
1. Issue the
set tone-clock 2A
command.
2. Rerun the test.
1130
ABORT
Only occurs when recycling carrier 2B. Indicates that the Active
Expansion Interface Link for the EPN is in carrier 2B.
Expansion Interface Link for the EPN is in carrier 2B.
1. Issue the
set expansion-link A01
command.
2. Rerun the test.
2000
ABORT
Response to the test request was not received within the allowable
time period.
time period.
2029
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a maximum of five
times.
2. If the test continues to abort, escalate the problem.
Continued on next page