Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-262
CARR-POW (Carrier Port Power Unit) for DC-Powered Systems 
10
CARR-POW (Carrier Port Power Unit)
for DC-Powered Systems
Generic 1 offers two basic cabinet type configurations: (1) the multicarrier 
cabinet system and (2) the single-carrier cabinet system. Both cabinet system 
configurations may be powered by either an external AC or DC power source.
NOTE:
For environment maintenance, the PPN or EPN cabinet configuration 
aspects for a High or Critical Reliability system are irrelevant.
The environment maintenance strategy to be used depends on both the cabinet 
configuration and the type of powering. Therefore, refer to the following list to find 
the appropriate MO section(s).
For a single-carrier cabinet system, refer to the "DC-POWER 
(Single-Carrier Cabinet Power)" Maintenance documentation for 
environment maintenance strategy.
For a multicarrier cabinet system using an external AC power source, refer 
to one or more of the following Maintenance documentation sections: 
"AC-POWER (AC Power) for AC-Powered Systems", "CUST-ALM 
(Customer-Provided Alarming Device)", or "POWER (Battery & Battery 
Charger) for AC-Powered Systems".
For a multicarrier cabinet system using an external DC power source, refer 
to one or more of the following Maintenance documentation sections: 
"AC-POWER (AC Power) for DC-Powered Systems", "CUST-ALM 
(Customer-Provided Alarming Device)", or "POWER (Battery & Battery 
Charger) for DC-Powered Systems".
Every carrier in the system must be supplied with +5 volt, -48 volt, and -5 volt DC 
power for the various circuit packs to operate properly. A multicarrier system can 
be supplied by an external AC power source or an external DC power source.
In a DC-powered system, power is supplied to the carriers as follows: DC power 
from an external device comes into Power Distribution Units (PDU J58890CF and 
PDU J58890CF-1), which distribute the power via circuit breakers (CB1-CB12 for 
PDU J58890CF, CB1-CB6 for J58890Cf-1) to the carrier power units. Each carrier 
in the system is equipped with two power units, the 644A and the 645B, which 
together supply the required voltages to the carrier. Figure 10-17 illustrates the 
position of the carrier power units and PDU J58890CF and shows which power 
unit each circuit breaker controls (Figure 10-17 also shows other Environment 
1.
Recycle the carrier indicated by the Port field in the Alarm Log.
MO Name (in 
Alarm Log)
Alarm 
Level
Initial Command to Run
1
Full Name of MO
CARR-POW
MAJOR
recycle carrier PC
Carrier Port Power Unit