Compatible Systems A00-1869 ユーザーズマニュアル

ページ / 44
Chapter 2 - Mounting Instructions
6
Parts and Tools
The following items are needed to install the mounting ears and handles on the IntraPort Enter-
prise-8 VPN Access Server. 
• 
IntraPort Enterprise-8 unit
• Two 
mounting 
ears
• Two 
handles
• 
Two handle spacers
• 
14 mounting screws (10-32 undercut flat head)
• Phillip’s head screwdriver
In addition to the above items, the following items are needed to install the IntraPort Enter-
prise-8 VPN Access Server in an equipment rack. 
• 
One left rack-mount bracket 
• 
One right rack-mount bracket
• 
One DB-25 male to DB-25 female console cable
• 
Tape measure (optional)
• Level 
(optional)
• 
Your own screws or clips, for fastening the brackets to the rack
• 
At least two people to lift the device into place. Do not attempt to move the device 
into the rack or onto a table or platform by yourself.
Changing the Power Supply Voltage Settings
The default setting for the voltage switches on the server’s power supplies is for a low input 
voltage (marked 115V on the switch). If your electrical system requires a high input voltage on 
the power supplies, you must change it manually on the device before plugging the device in.
To change the settings:
1.
Make sure the server is powered down and not connected to any power source.
2.
Using a small screw driver, change the voltage switches to the desired setting (230V 
for high input voltage, 115V for low input voltage).
Figure 1. Location of Voltage Switch on the Power Supply