APC PMF4S-A ユーザーズマニュアル

ページ / 20
Proper installation is imperative to maximize the APC Modular Panel  SPD’s
effectiveness and performance. The installer should follow the steps outlined 
in this instruction manual to ensure proper installation. 
disconnect only.
Inspect the entire shipping container for damage or signs of mishandling 
before unpacking the device. Remove the packing material and further 
inspect the device for any obvious shipping damage. If any damage is 
found and is a result of shipping or handling, immediately file a claim with 
the shipping company.
The device should be stored in a clean, dry environment. Storage 
temperature is -40 to +65 °C (-40 to +149 °F). All of the packaging 
materials should be left intact until the device is ready for installation.
UNPACKING AND  
PRELIMINARY INSPECTION
STORAGE
 
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC 
FLASH
·  Apply appropriate personal protective equipment (PPE) and follow safe  
  electrical work practices. See NFPA 70E.
·  This equipment must only be installed and serviced by qualified  
  electrical personnel.
·  Turn off all power supplying this equipment before working on or  
  inside equipment.
·  Always use a properly rated voltage sensing device to confirm  
  power is off.
·  Replace all devices, doors and covers before turning on power to this  
  equipment.
Failure to follow these instructions will result in death or  
serious injury.
Read the entire
 
instruction manual before beginning the installation. These instructions are
 
not intended to replace national or local electrical codes.  Check all applicable 
 
electrical codes to verify compliance. Installation of surge suppressors should
 
only be performed by qualified electrical personnel.
NOTE: SPD s are designed for use on the load side of the service entrance 
'
PACKAGING
APC MODULAR PANEL PRODUCTS Surge Protective Device (SPD)
6