Echo SRM - 280U ユーザーズマニュアル

ページ / 40
G
rass
 T
rimmer
/B
rush
 C
uTTer
O
peraTOr
'
s
 m
anual
13
Install Blade 
Parts Required:  Upper Plate w/ 20 mm pilot, Lower Plate, 10 mm Nut 
w/L.H. threads, 2 x 25 mm Cotter Pin, Blade.
1.  Install upper plate (D) on splined PTO shaft, pilot side down.  
Blade installation requires Upper Plate (D) with 20 mm pilot.
2.  Install Blade (K) on upper plate pilot. Blades must be installed so 
that rotation arrow on blade matches rotation of unit:  teeth toward 
direction of rotation (See debris shield decal). Secure blade with 
Lower Plate (H), and 10 mm L.H. nut (G). Turn nut counter-clock-
wise on PTO shaft to tighten. 
3.  Align hole in upper plate with notch in gear housing, and insert 
Locking Tool (L) to prevent splined shaft from turning.  Arrow on 
gear housing points to notch.  Tighten 10 mm nut securely.
4.  Insert Cotter Pin (F) in hole in PTO shaft, and bend pin legs around 
shaft counterclockwise to retain 10 mm nut.
IMPORTANT
Never reuse a cotter pin - install a new cotter pin each time a blade 
is installed or replaced.
 
5.  Remove locking tool.  
D
20
L
K
G
F
H
D
K
H
G
F
L
A
u
-
handle
 
InstallatIon
Parts Required:  U-Handle, Clamp w/screws, 8 mm  x 55 mm hex 
bolt, 8 mm flat washer
1.  Install upper U-Handle and bracket on lower bracket with one 
(1) 8mm x 55mm bolt (A) and (1) large circular washer.  Do not 
tighten bolt securely until final adjustments are completed.
2.  Loosen upper (2) U-handle clamp screws (B), and position U-
handle as shown.
3.  Lightly tighten 8mm bolt (A) and clamp screws (B) to hold U-
handle in position until final adjustments are completed.
4.  Route throttle linkage and ignition lead assembly along shaft and 
clip as shown.
B