Zenoah BT250 ユーザーズマニュアル

ページ / 52
18
6. Set up
English
■ INSTALLING HANDLE (SE1)
• Mount the handle to the shaft tube and clamp it at
your best operating position.
■ INSTALLING DEBRIS GUARD (SE2)
• This model pack with already installing debris guard.
• Put the debris guard on the shaft tube near the gear
box, attach it with the screw, washer and nut
provided.
■ INSTALLING CUTTING HEAD (SE3)
1. While locking the gear shaft by inserting the
attached bar into the upper holder and the housing. 
2. Rotate the cutting head to engage threads. Hand-
tighten it securely. 
SE1
SE2
SE3